(Dec 2016) Hyperion Power Services, successfully completed a two-year Owner’s Engineer engagement with Engie Peru (formerly known as Enersur GDF Suez) for the extension project of Chilca Plus combined cycle power plant, a project known as ChilcaDos.

ChilcaDos is a combined cycle plant consisting of a gas turbine and a steam turbine that together have a nominal capacity of 111MW.  The central gas turbine came into commercial operation in May 2016 and the turbine steam in December 2016.

The project also included the construction of a new 220kV transmission line connecting to the central ChilcaUno substation, a new system of gas pipelines and for the supply of natural gas to the facility, as well as a new piping system of desalinated water and de-mineralized water from the ChilcaUno water storage tanks. 

 